As mentioned in another post, our birds got a bit feistier a lot faster than we hoped, so we needed to separate them sooner than expected. March was too cold and wet to build outside, so we started this chickshaw build in the basement. And measured 4 or 5 times to make sure we could still roll it outside on a creeper. (Notice how well Obie is supervising the logistics of the move.)
How often does math come in handy? Erryday.
Previous
Previous
chickshaw edits
Next
Next